TIGER SKY Tower

2.121.600 AED

About the project

Tiger Sky Tower stands as an unparalleled symbol of luxury and sophistication, situated in the heart of Dubai’s most exclusive area, alongside iconic developments such as Damac Paramount, Jacob & Co, and SLS. With its striking 122 floors, this towering masterpiece redefines what it means to live in luxury.
Each apartment within Tiger Sky Tower is fully furnished and equipped to the highest standards, with interiors crafted from the finest materials available. Every unit is outfitted with premium appliances from the prestigious Candy brand, ensuring that every home exudes elegance and refined living. The tower’s penthouses, which come in various styles, including Arabic, Chinese, Greek, and French, offer a highly customizable living experience, allowing residents to shape their home according to their personal tastes and cultural influences.
Not only does Tiger Sky Tower boast luxurious living spaces, but it also holds an impressive collection of 5 world records. Standing at an incredible height of 532 meters, it offers breathtaking views of the city skyline and beyond. The tower spans a built area of 2.5 million square meters, providing ample space for an exclusive, world-class living experience.
Among the tower’s remarkable features are a rainforest located at 447 meters, an exhilarating roller slide at the same height, and an indoor pool on the 431st floor with panoramic views of the iconic Burj Khalifa. At an astonishing 449 meters, residents and guests can also enjoy an ultra-luxurious restaurant offering fine dining with unparalleled vistas.
Tiger Sky Tower is not just a building; it’s an experience, bringing together cutting-edge design, world-class amenities, and record-breaking achievements to offer a lifestyle that is truly one of a kind.

read more

Amenities

Cinema

Concierge

Gym

Penthouse

Rainforest

Roller coaster

Spa

World's tallest infinity pool

Units

Apartments

1-4 bedroom apartments
873 to 2974 sq ft

Project timeline
Lorem ipsum dolor sit amet, consectetur adipiscing elit.

1

Project announcement

x

2

Construction Started

2024

3

Expected Completion

2029

Payment plan

20%

Down Payment

50%

During Construction

30%

On handover

Location

Click to see your future home

Click to see your future home

Compare Listings

Tiger